|
Specialist Electrical Engineering Consultants |
|
Transmission Grid Consulting (Pty) Ltd. |



|
Together with AREVA as part of PNO, TGC participate in the Eskom SCADA project. This project will be complete by the end of 2007 |
|
Multiple approved DSM projects to reduce electricity usage over peak by installation of multiple and smart devices. |
|
This project includes the audit, network analysis, measurements, refurbishment, re-commissioning, and detail design of control equipment. |
|
TGC acts as consultant on all steady state and dynamic related studies for multiple small generator units that WPD do for utilities who intends installing it in their system in future. |
|
As operational and studies consultant for MOTRACO TGC has performed multiple tasks, including Master plans, QoS measurements, drafting specifications, evaluate, design, etc. |
|
SCADA |
|
WPD—generator integration studies |
|
EdM—Alto Moloque SVC |
|
DSM |
|
MOTRACO |




|
Project List |
|
TGC Transmission Grid |